Rowan Drilling
- Markets:All projectsOil & Gas
- Country:USA
Project Description
The customer was looking for a way to reduce the temperature in the control room of one of their vessels.
Coating Solution
SUPER THERM was applied to the roof of the Control Room and the welder’s shack was primed with RUST GRIP and top-coated with SUPER THERM.
Results
After the application of SUPER THERM the surface temperature of the roof dropped by 63°F (17°C) and the inside ceiling temperature dropped dramatically.
Products we used
Our knowledgeable staff is available to answer any questions you may have. Call, text or email us anytime.